사회주의 수도의 건설과 주민 생활 — 1959년 ‘國慶工程’과 철거・이주 문제 —
社会主义首都的建设和居民生活 - ‘国庆工程'和拆迁
- 주제(키워드) PRC 10th Anniversary Architectural Projrect , Beijing , The Great Hall of the People , capital , demolition and relocation , 國慶工程 , 北京 , 人民大會堂 , 수도 , 철거・이주 , 国庆工程 , 北京 , 人民大会堂 , 首都 , 拆迁
- 발행기관 중국근현대사학회
- 발행년도 2019
- 총서유형 Journal
- DOI http://dx.doi.org/10.29323/mchina.2019.3.81.49
- KCI ID ART002454667
- 본문언어 한국어
초록/요약
PRC 10th Anniversary Architectural Project(Guqinggongcheng), which was the symbolic appearance of the capitalist socialist capital, ran very hastily in the background of the Great Leap Forward Movement and exposed various problems. The building of the capital city of Beijing is a business centered on the leadership of the party-state, which has a lot of resources and energy concentrated, and has been rapidly promoted in the background of the Great Leap Forward Movement. These achievements were in contrast to the housing supply that did not satisfy demand and the increasingly deteriorating residential environment. Some of the people who had been demolished by Guqinggongcheng were still unable to obtain stable housing even after a few years. In the 1950s, urban planning existed in Beijing, but Guoqinggongcheng and housing supply were not systematically implemented based on urban planning.
more초록/요약
PRC 10th Anniversary Architectural Project(Guqinggongcheng), which was the symbolic appearance of the capitalist socialist capital, ran very hastily in the background of the Great Leap Forward Movement and exposed various problems. The building of the capital city of Beijing is a business centered on the leadership of the party-state, which has a lot of resources and energy concentrated, and has been rapidly promoted in the background of the Great Leap Forward Movement. These achievements were in contrast to the housing supply that did not satisfy demand and the increasingly deteriorating residential environment. Some of the people who had been demolished by Guqinggongcheng were still unable to obtain stable housing even after a few years. In the 1950s, urban planning existed in Beijing, but Guoqinggongcheng and housing supply were not systematically implemented based on urban planning.
more

